T800.1

FP95/120

K70

FP95/120

K80

FP95/120

K8

FP95/120
03:11
Feeder Head Vaculift III: Pre-Blower and Centre Blower Adjustments
Correct adjustments of the pre- and centre blowers of the Vaculift III feeder head are a basic requirement for proper sheet pile ventilation at the feeder.

Les étapes du travail

Les étapes du travail avant: Adjustment of the lateral stop brackets to the respective format width
Les étapes du travail après: Front and lateral ventilation adjustments
02:16
Feeder head Vaculift III: Bellows Suction Cups Height Adjustment
To ensure a stable sheet separation process, the distance between the pile and the bellows suction cups of the Vaculift III separation head must be set correctly.

Les étapes du travail

Les étapes du travail avant: Pressing an emergency stop button of the respective machine
02:31
Palletized Feeder Front and Lateral Ventilation Adjustments
The front and lateral ventilation adjustments complete the ventilation of the sheet pile at the feeder.

Les étapes du travail

Les étapes du travail avant: Pre-blower and centre blower adjustments
03:11
Palletized Feeder Front and Lateral Ventilation Adjustments
The front and lateral ventilation adjustments complete the ventilation of the sheet pile at the feeder.

Les étapes du travail

Les étapes du travail avant: Operation of an emergency stop button on the respective machine
02:41
Cleaning the Feeder Pump Filters
The pump filters must be cleaned regularly to ensure the performance of the machine's blast air and vacuum based functions.

Les étapes du travail

Les étapes du travail avant: Switching off the respective machine via main switch; Letting the pump cool down for 30 minutes; If necessary removing the pump from the noise damping hood